Data Platforms · Service line

Data Migration & Modernization

Data Migration & Modernization is the move of legacy data warehouses and ETL to Databricks or Snowflake, covering inventory and assessment, target design, code and schema conversion, historical loads, parallel runs with reconciliation, a tested cutover and decommissioning of the legacy platform.

AT A GLANCE

For
Enterprises
Lifecycle
  1. Assess (covered)
  2. Design (covered)
  3. Build (covered)
  4. Validate (covered)
  5. Deploy (covered)
  6. Operate (covered)

Who it’s for

For teams leaving a legacy data platform.

  • Legacy warehouses near end of life

    Licensing, hardware or support terms are forcing a move, and the business cannot afford wrong numbers after it.

  • ETL nobody wants to touch

    Years of jobs, stored procedures and scripts run the reporting, and few people know what all of them do.

  • Modernizing for analytics and AI

    You want one governed platform for analytics and AI, not another copy of the old one.

Scope

What we do.

A migration covers the whole data lifecycle, with reconciliation as the gate for cutover.

  1. 01

    Inventory and assessment

    Catalog the legacy warehouse and ETL: databases, tables, jobs, procedures, reports, dependencies and usage, and flag what can be retired rather than moved.

  2. 02

    Target design

    Design the target on Databricks or Snowflake, map legacy structures to the layered model, and decide where to rebuild rather than convert.

  3. 03

    Code and schema conversion

    Convert schemas, SQL, stored procedures and ETL logic, with automated conversion where it is reliable and manual rewrites where it is not.

  4. 04

    Historical data loads

    Load history in planned batches, with checksums and row counts recorded for each load.

  5. 05

    Parallel runs and reconciliation

    Run old and new side by side, and reconcile row counts, key totals and agreed business measures until every difference is explained or fixed.

  6. 06

    Tested cutover with rollback

    Rehearse the cutover, agree go and no-go criteria, and keep a tested rollback path until the new platform is accepted.

  7. 07

    Decommissioning

    Retire legacy jobs, databases and access in an agreed order once consumers have moved and records are archived as required.

Deliverables

What you receive.

  • Migration inventory

    Every object, job and report in scope, with dependencies and a move, rebuild or retire decision.

  • Target design and mapping

    Legacy-to-target mapping for schemas and logic.

  • Converted code and schemas

    In your repositories, with tests.

  • Reconciliation reports

    Per load and per parallel run, against the legacy system.

  • Cutover and rollback plan

    Rehearsed, with agreed go and no-go criteria.

  • Decommissioning plan

    Order, owners and archive requirements for retiring the legacy platform.

Engagement

How an engagement runs.

Phases map to the Data Platforms lifecycle. Each phase ends with a review before the next one starts.

  1. 01

    Inventory

    • Assess

    Catalog objects, jobs, reports, dependencies and usage, and decide what moves, what is rebuilt and what retires.

  2. 02

    Design

    • Design

    Design the target and the mapping, and plan migration waves by dependency and business risk.

  3. 03

    Convert and load

    • Build

    Convert schemas and logic, build pipelines and load history, wave by wave.

  4. 04

    Reconcile

    • Validate

    Run in parallel and reconcile against the legacy system until the agreed checks pass.

  5. 05

    Cut over

    • Deploy

    Rehearse, cut over with a rollback path, and move consumers to the new platform.

  6. 06

    Decommission and run

    • Operate

    Retire the legacy platform in stages and run the new one under 24x7 operations.

Platforms and tools

Platforms and tools.

Targets are Databricks or Snowflake, running on AWS or Azure. Conversion, loading and orchestration use ingestion, transformation and orchestration tools matched to your existing stack, with the engagement staffed for them.

Target platforms

  • DATABRICKS
  • SNOWFLAKE

Cloud

  • AWS
  • AZURE

Methods

  • SCHEMA CONVERSION
  • PARALLEL RUNS
  • RECONCILIATION

Legacy sources

  • WAREHOUSES
  • ETL JOBS
  • STORED PROCEDURES

The inventory covers whatever you run today.

Data Platforms · Assessment

Start with the 10-day assessment

Data Platform Assessment

A 10-day, fixed-fee assessment of your data estate, pipelines and governance, with a target architecture and migration path.

  • 10 working days
  • Fixed fee

FAQ

Questions buyers ask.

Which legacy platforms can you migrate from?

We start from an inventory of what you run and assess the conversion effort per object. Where a legacy technology needs specific skills, we say so up front and staff the engagement for it.

Do you convert or rebuild?

Both, decided per object. Tables and simple logic usually move by conversion; complex or unused logic is often rebuilt or retired. The inventory records each decision and the reason for it.

When do we stop running both systems?

When the agreed reconciliation checks pass for the agreed number of cycles and consumers have moved. Those criteria are set before cutover, not after.

What if the numbers don’t match?

Every difference is traced to a cause: a conversion error, a data issue in the source, or a legacy calculation that was itself wrong. Fixes are agreed with the data owners and recorded.

Can reporting continue during the migration?

Yes. Consumers stay on the legacy system until their data has passed reconciliation on the new platform, then move in planned waves.